Shop

Sale!

Job Description Template

$12.00 $10.00

Job Description Template is a fully editable template that can be customized to your needs. It is designed in a way that facilitates the user without the need for specialized knowledge of software and processing. Most of its elements are combined in such a way that the drag n drop technique can be applied. It has a minimum storage space as it has been compressed properly. As a result Job Description Template will help you design your HR documents easy and professionally.

Save time and impress with your professional image!

Τhe Job Description Template has been used with free fonts that you can download freely and install them on your system.

Compare

Additional information

Format

Software

Adobe inDesign

Usage

Compatibility

CS4, CS5, CS6, CC (if your software doesn't open the .indd file, try to open the .idml file instead)

Number of pages

1

Color Model

CMYK

Features

Image Placeholders, Editable Graphics, Vector Icons

Fonts

Open Sans (Download Link: https://www.fontsquirrel.com/fonts/open-sans)

Reviews

There are no reviews yet.

Be the first to review “Job Description Template”